💡 Asset analysis 🏷️ Purchase · SETAM bank-collateral sale · round 2 · ⏰ 2 Dec 13 Nov 2026 · 12 min read

Western Odesa: a 15,550 m² cold-storage and logistics complex at auction~9 ha of leased land, a rail line inside the site, refrigeration and banana-ripening rooms: ≈$1.6M in round two

The listing reads "non-residential buildings, 15,550 m², with 55 items of equipment". On inspection it is a port-side logistics yard: 26 buildings, most of them warehouses, covered loading docks, and an equipment list that includes 12 refrigeration units, 6 banana-ripening rooms, a truck scale and two diesel generators. It sits in an old industrial district of western Odesa, about 12.5 km by road from Odesa port, and a rail line runs through the site.

The mortgage holder is the state-owned Ukreximbank. The bank marketed the property itself in 2025 without success. In July 2026 it went into enforcement and is now being auctioned by a private enforcement officer on the Ministry of Justice platform SETAM. Round two starts at UAH 72,508,753 including VAT (≈$1,597,640). The auction is on 2 December. The roughly 8.98 ha of municipal land under the buildings is leased by the debtor and is not listed in the lot; how it transfers must be confirmed separately.

👤 Who is this for

Best fit: companies already importing food or fruit, or running cold-chain or warehousing operations in Odesa, that need more capacity with both port and rail access. Also worth a look: Ukrainian or foreign firms planning a distribution hub for reconstruction materials and equipment, provided they have a local operating team. Full comparison

Not for: purely financial buyers with no operating capability, buyers who cannot put up an ≈$80,000 deposit and $1.3–1.6M in full, or anyone unwilling to accept wartime risk in Odesa.

1

Key facts (official data)

Sale typeEnforcement sale of mortgaged property on SETAM (Ministry of Justice platform), run by a private enforcement officer; round 2
LocationKhadzhybeiskyi district (formerly Malynovskyi), western Odesa, by the Tiraspol highway and the railway
Buildings26 buildings, 15,550 m² in total: administrative buildings of 2,443.9 m² and 155.2 m²; 17 warehouses of about 11,900 m² (the largest 2,630.6 m², 1,092.7 m² and 1,064.6 m²); workshops, a 219.2 m² loading ramp, gatehouses, a transformer room
Equipment (55 items)12 refrigeration units (Soviet-era 2FUUBS18 / 4PB28 models), Hitachi cold-room equipment, a Frascold compressor and air cooler, a temperature-logging system, 6 banana-ripening rooms, a truck scale, lifts, an electric hoist, 200 kW and 100 kW diesel generators, gas and electric boilers, fire alarm, lathes and woodworking machines
TitleNotarised purchase agreement of 18 January 2002
Starting priceUAH 72,508,753.26 including 20% VAT (≈UAH 60.42M net); ≈$1,597,640 at the NBU rate of 13 Nov 2026 (USD 1 = UAH 45.38)
Deposit / bid stepUAH 3,625,437.66 (5%, ≈$79,882) / UAH 725,087.53 (1%)
Deadline / auction2 Dec 2026, applications close 08:00, auction 09:00 (Kyiv time)
Registered so far1 applicant (registered 2 Nov, "pending"; registering is not the same as paying the deposit)
EncumbrancesUkreximbank mortgage of 4 Sep 2018 (amended 2019) with the related ban on disposal; pledge of movable assets to the same bank; arrest by the enforcement officer on 22 Jul 2026, inventory on 30 Jul. The cadastral-number field is empty: the land is not part of the lot
ViewingBy appointment with the custodian. Site photos were taken on 30 Jul 2026

Some building areas differ between the SETAM notice and the bank's 2025 brochure (for example warehouse V: 2,630.6 m² vs 2,758.9 m²). Both total 15,550 m²; the technical passport is the authority.

2

What it is: a cold-storage and warehousing yard

Loading docks
Covered loading docks, with tyres as dock bumpers: trucks back straight up to the platform
Cold-room doors
A row of cold-room doors behind the docks
Refrigeration units
Refrigeration units and receivers, tagged with the enforcement officer's inventory numbers
Sectional doors
Some stores have been fitted with modern sectional doors
Office corridor
Inside the administrative building: tiled floors, new doors, usable as is
Open land to the north
Open, overgrown ground on the larger northern plot
3

Location and logistics

Satellite view
Satellite view from Ukreximbank's brochure: the northern plot (7.32 ha) and the southern yard (1.42 ha) are separated by the railway; the red line in the middle is the on-site track
ToBy roadApprox. time
Odesa port12.5 km16 min
Odesa city centre10 km11 min
Odesa main railway station9.5 km10 min
"7th Kilometre" wholesale market12.8 km18 min
Chornomorsk port27.7 km28 min
Pivdennyi port44 km52 min
M-05 towards Kyiv (city exit)≈21 km≈30 min
4

Land: 8.98 ha of municipal leasehold

Site plan
Site plan from the bank's brochure (cadastral numbers blurred): the 7.32 ha plot on the left; the 1.42 ha yard and a 0.244 ha strip along the railway on the right
5

Price history and comparison

WhenEventPrice (incl. VAT)Result
2025Ukreximbank markets the collateral itselfNo price in the brochureNot sold
Jul 2026Arrest (22 Jul), inventory and photos (30 Jul)——
Published 25 Sep, auction 26 OctSETAM round 1UAH 85,304,416 (≈$1.88M)3 registered; all rejected for not paying the deposit; no sale
Published 2 Nov, auction 2 DecSETAM round 2 (−15%)UAH 72,508,753 (≈$1.60M)Open, 1 registered
If it fails againRound 3 (−30% from round 1), the last round≈UAH 59,713,091 (≈$1.32M)—
6

Post-war opportunities: what this yard can become

Odesa's three ports (Odesa, Chornomorsk, Pivdennyi) are Ukraine's main maritime gateway. During the war they mostly ship grain; after it, containers, imported consumer goods and reconstruction materials will flow back through them. Below is our assessment based on the site's features. It is not a return forecast.

UseWhat the site offersOur view
Cold-chain hub for imported fruit, meat and dairyCold rooms, ripening rooms, docks, temperature logging, 16 min from the portMost natural This is what it was built for. Needs equipment upgrades and food-safety permits
Distribution hub for reconstruction materials and equipment (steel, windows, insulation, machinery parts)Large warehouses, on-site rail, truck space, 9 ha of landGood fit Unload at the port, bring goods in by rail or road, distribute nationwide. Demand should rise sharply once reconstruction starts
City warehouse and e-commerce fulfilment for imported goodsClose to the city and the "7th Kilometre" marketPossible Works as an urban distribution centre. A customs warehouse needs a separate licence
New modern warehouses on the open northern landThe 7.32 ha plot has open ground with industrial useMedium term Confirm the lease and building permits first; the land can be bought later under Article 134
Residential or commercial redevelopmentOld industrial area, housing to the westNot realistic now Needs a land-use and zoning change; long and uncertain. Do not price on this

Why "post-war": in wartime, ports and logistics sites can be struck, insurance is hard to get and import volumes are low. Much of this asset's value depends on how fast port traffic and import demand recover after the war. Buying now means securing a position for the recovery. Plan for "can operate in wartime, can scale after the war", and do not budget on post-war full capacity.

7

Investment residence

Foreigners who invest $100,000 or more in Ukraine's economy may apply for an immigration permit. Buying this complex through a foreign-owned Ukrainian company and running a real cold-chain or logistics business fits the "investment in the economy" rule well.

To be clear: immigration permits are subject to annual quotas and decided by the Migration Service, so approval is not guaranteed. Funds must be in foreign currency, transferred from abroad, with a documented source. Buying property in a personal name generally does not count, and wartime procedures may change. Residence should never be a reason to overpay or to buy an asset you cannot use. A cheaper route is a work permit plus temporary residence.

8

Who it suits

BuyerFitWhy
Fruit and food importers, cold-chain operators in OdesaBestCan pick up the original use; know the equipment and permits
Distributors of reconstruction materials and equipment (with a local team)GoodPort, rail and a large yard; clear post-war demand
Third-party logistics companiesWorth a lookMust budget for upgrades and wartime vacancy
Purely financial buyers seeking rentNoOld equipment, complex land paperwork, needs active management
Individuals without a team in UkraineNoA 9 ha yard needs daily management
9

Risks and real costs

① Land leases. Land is not in the lot. Lease validity, remaining term, arrears and how much land transfers must all be checked first. This is the number-one issue.
② Current occupants. The photos suggest parts of the yard are in use. Ask the custodian about tenants and lease terms; a change of owner does not automatically end a lease.
③ Ageing equipment. The main refrigeration units are Soviet-era; replacement could be costly. Cold-room insulation and floors also need checking.
④ Rail line ownership. Who owns the on-site track, whether it can be used, and whether the connection agreement is valid all need separate verification.
⑤ Enforcement procedure. The debtor could challenge the sale in court; have a lawyer review the enforcement file.
⑥ Wartime risk. Odesa's ports, energy and logistics facilities are regularly attacked; insurance is hard to get and power cuts are common. The two on-site diesel generators help.
⑦ Payment timing. 🟡 After an enforcement auction the full price must be paid within a short period; see SETAM rules and the sale documents. Have funds ready; do not plan to arrange financing after winning.

Real cost = sale price (VAT-registered companies may be able to reclaim input VAT 🟡) + lease transfer or new lease + refrigeration upgrades + repairs to cold rooms and roofs + food-safety and other permits + insurance and security + notary and registration fees.

10

How to take part (in phases)

This is a phase-one analysis, based on the SETAM notice, the equipment list, the enforcement officer's photos and the bank's public brochure. Whether to bid should wait for phase-two findings.

PhaseScopeFee
Phase 1 (this article)Public information, location and logistics, price history, use assessmentFree
Phase 2: legal due diligenceBuilding title extracts; leases, remaining term, arrears and registration of all three plots; rail track ownership; enforcement basis and valuation; current tenantsPer our due-diligence scale: 1% for assets over $100,000 (≈$13,000–16,000)
Phase 3: site inspection and bidding planRefrigeration engineer test run, structure, power capacity, upgrade budget, maximum bidQuoted at cost

Timing: applications close at 08:00 on 2 December. Phase two takes about 2–3 weeks, so start now if you want to bid in this round. Otherwise you can aim for round three (the last), where competition may be more concentrated.

Foreign buyers normally bid through a Ukrainian company (foreign ownership allowed). We can help with company set-up, due diligence, the auction and the lease transfer. Auction services are provided by our partner ТОВ «ЛЕНД ЕНД ЕКСПАТ» (Luqiao); land and corporate services by LLC «SYMBIOSIS INTELLECTUAL SERVICES». The AU139 platform does not handle any transaction funds.

11

Contact us

💬 Looking for a cold-chain or logistics base behind Odesa port?

Land and enforcement checks need to be done before 2 December. Tell us your intended use and budget, and we will arrange phase-two due diligence, a site viewing and a bidding plan.

LLC «SYMBIOSIS INTELLECTUAL SERVICES» (Odesa)
WhatsApp / Telegram: +380 95 208 6987
WeChat: 13817722488

Sources: SETAM round 1 and round 2 notices and equipment list; enforcement officer's photos of 30 Jul 2026; Ukreximbank 2025 collateral-sale brochure (eximb.com); NBU exchange rate of 13 Nov 2026; OSRM road distances, OpenStreetMap. ✅ sourced · 🟡 our interpretation · ❓ to be verified. This is business information, not legal advice or a return forecast.